1.
Layout parts before assembly. (fig. 1) sections with channel on one
side, sections without on the other side.
2. Layout skids, spreader bar(s), pull straps and fasten in place.
(fig. 2)
3. With one person at each end, hook the angle into the channel (fig.
3) and lift the two parts into position. (fig. 4)
4. Pick up the section (fig.5) and mount it on the skid and nail it
in place.
5. After assembling the 1st section, install the back. (Don't tighten
the bolts until you have the shelter all together.)
6. Now assemble the rest of the sections installing the braces as
you go. (fig. 8)
7. Tighten all bolts after assembly is complete. After putting your
shelter where you want it make sure to anchor it to the ground or
it will blow away. |
|
|
|
|
|
|
|
|
|